Florida land feasibility · pre-purchase due diligence

Know what can stop the project before you buy the land.

A structured, source-backed feasibility review that turns public records, site constraints and agency requirements into a clear next decision.

Florida-focused · Independent screening · Human-reviewed verdict

21elimination gates
60+documented failure modes
1clear decision path

01 / The base rate nobody underwrites

Most pro formas assume the project lands on time. The odds say it won’t.

76%

projects that finish late

State of Construction Scheduling 2025 (n > 70,000 CPM schedules)
8.5%

projects that hit budget and schedule

Flyvbjerg, Oxford (n > 16,000)
0.5%

hit budget, schedule and benefits

Flyvbjerg, Oxford
+28%

average cost overrun (85% of projects overrun)

20 countries, 70 years
0.75–1.0 pt

IRR erosion per month of delay

Innowave Studio
+4.64%

cost overrun per year of delay

Flyvbjerg

The information existed. The decision to look for it wasn’t made — because it costs money in the phase where the budget is tightest and the pressure to close is highest.

02 / Technical screening inside the study

A first technical read on the parcel — from public records, inside the study.

Every feasibility study includes a screening-level pass on the things that usually cost money to discover late. Each one is an estimate built from public records with its source cited — a clear view to decide on, not sealed engineering. Where a number needs a licensed engineer to certify it, we say so, on the same line as the number.

Zoning & PUD pre-analysis

Future land use vs. current zoning, what the code allows, and whether it needs a rezoning or a PUD — with the open-space and dimensional traps that kill yield. Read from public records.

Topography, soil & grading (raise)

Public LiDAR and soil surveys turned into rough cut/fill, finished-floor vs. the 100-year flood, and whether the site has to be raised with fill to get out of the floodplain. Order-of-magnitude, not a sealed grading plan.

Retention pond pre-sizing

Required treatment volume from water-management-district criteria, impervious area measured by geometric union, and whether a pond of plausible size fits. Screening can rule a site out cheaply; sealed design confirms it.

Traffic / corridor capacity screening

Trip generation for your program against the road’s official service volume: level-of-service today, future, and with your project. It flags whether a full traffic study and its cost belong in your price. It is not a sealed Traffic Impact Study.

Screening with cited sources · a professional opinion, not a certification · every figure has a source and a status

03 / The screening system

Every parcel runs through the same disciplined questions.

01

Land & title

Parcel identity, ownership signals, easements and recorded constraints.

02

Zoning & use

Future land use, zoning district, density, setbacks and intended-use fit.

03

Water & environment

Flood exposure, wetlands, soils, drainage and environmental flags.

04

Access & utilities

Legal access, roadway context, water, sewer, power and service gaps.

05

Cost & schedule

Known fees, likely studies, agency steps and the next professional decisions.

06

Verdict & next move

A sourced go, conditional go, or stop—with open questions clearly labeled.

04 / What you receive

A decision document, not a pile of links.

The report identifies what is known, what is estimated and what still needs confirmation—so you can price uncertainty and decide whether to proceed.

  • Executive verdictGo, conditional go, or stop—with the reason.
  • Constraint registerRisks ranked by impact and urgency.
  • Source trailAgency and public-record support behind findings.
  • Next-action planWho to call, what to verify and what to budget.

What a full study contains

The sections below are the structure of a complete feasibility study, which is the Concept Feasibility Plus level. A Core Feasibility Study covers the parcel, the code and every constraint category, and closes with a financial model built on stated assumptions; the market sections — comparables, alternative programs, scenarios, deal structure and exit — belong to Concept Plus. A Rapid Parcel Check is a screen against the same questions, not the full document.

  1. Executive memorandum and recommendation
  2. Opportunity snapshot
  3. Property overview
  4. Municipal and corridor context
  5. Land use, zoning and entitlement path
  6. Approval complexity and timeline
  7. Environmental review
  8. Infrastructure, access and parking
  9. Comparable analysis and adjustment grid
  10. Development pipeline and competitive supply
  11. Highest and best use — at least three programs compared
  12. Development yield and construction economics
  13. Financial model
  14. Investment committee view
  15. Risk register
  16. Deal structure options
  17. Value creation strategies
  18. Exit strategy
  19. KLB Development Score, with its full breakdown
  20. Recommendation, action plan and basis

Your intended use decides which sections carry weight. A study that answers a question you did not ask is a study you paid for twice.

05 / What it costs

Choose the level of certainty the decision needs.

Fixed fees, agreed before any work begins. Every engagement starts by confirming the parcel and your intended use, so the scope matches the decision you actually have to make.

Rapid Parcel Check

$295

For a parcel you are still deciding whether to pursue.

A public-record screen of the gates that kill deals—land use, zoning, access, utilities, flood, wetlands, recorded restrictions—each with its source and a go / caution / stop verdict. If a gate comes back red, that is your answer and the work stops there.

Paid in full before work begins.

Concept Feasibility Plus

from $1,750

For a builder or developer deciding what to pay.

The Core study plus the market: land comparables with an adjustment grid, at least three programs compared side by side, scenarios and sensitivity, deal structures and exit routes—a recommendation you can hand to a partner or a lender.

50% deposit, 50% before delivery.

Custom engagement — from $2,500. Multiple parcels, several scenarios, rezoning or PUD complexity, agency coordination or an unusually compressed deadline are quoted individually. Final scope and fee depend on the parcel, the county, the intended use and the documents available—confirmed in writing before you approve anything.

06 / How the study works

From a parcel to a decision, in four steps.

  1. Send the parcelAddress or Parcel ID, what you intend to build, and the deadline you are working against.
  2. We confirm scope and feeWe verify we are looking at the right parcel, then put the scope, the fee and what we need from you in writing. Nothing starts until you accept.
  3. We run the screeningEvery parcel goes through the same questions, against the public record. Each finding is marked verified, estimated or pending confirmation.
  4. You receive a decisionGo, conditional go, or stop—with the constraints, the open questions, the studies still needed and who to call next.

Where the answers come from

We name our sources so you can check them, and so the professionals you hire next can start from them instead of repeating the work.

  • County property appraiserParcel identity, ownership, assessed value and sales history.
  • County GIS, zoning code and comprehensive planZoning district, future land use, density, setbacks and overlays.
  • FEMA National Flood Hazard LayerFlood zone, base flood elevation and mapped exposure.
  • Wetland inventories and state environmental recordsMapped wetlands, surface waters and conservation areas.
  • Public LiDAR and NRCS soil surveysTerrain, drainage patterns and soil behavior.
  • Water management district criteriaTreatment volume and retention requirements for the district your parcel sits in.
  • State and county roadway dataAccess, right of way and the corridor’s official service volume.
  • Utility service providersWater, sewer and power availability near the parcel.

Two rules govern every figure

  • Every figure carries its statusVerified, estimated, or pending confirmation. A figure with no status does not enter the report.
  • A missing number is declared, never filled inIf a datum is missing we say so, and we name the source that closes it. A dated “pending” is worth more than an invented number.

Where the questions come from

The screening is not a checklist someone wrote from memory. It is built on a catalogue of why development projects stall and die: more than 60 verified causes across seven fronts—utilities, permitting, environment, title, money, construction and management—from roughly 180 sources.

Almost everything is discovered during construction. Almost all of it was detectable before closing.

A transformer with a 128-week lead time gets ordered in month four of construction; it could have been reserved before the land closed. A three-year pavement-cut moratorium surfaces when the right-of-way permit is filed; it was sitting in the county’s public repaving calendar all along. That is what the gates are for: each one resolves green, amber or red against its own source, and a red one stops the study before more money goes in.

What this study is — and is not

It is a preliminary, source-backed screening and a professional opinion. It is not a title search, a legal opinion, an appraisal, a boundary survey, a wetland delineation, a geotechnical report, a Phase I environmental assessment, or signed-and-sealed engineering. Public maps and records can be incomplete, outdated, or subject to agency confirmation, and no study can guarantee that an agency will approve anything.

Those sealed deliverables are prepared by licensed professionals. Our job is to tell you whether and when it is worth paying for them—and to hand them a clean, sourced starting point.

07 / Built for an early decision

Before contract

Screen fatal constraints before committing capital.

During due diligence

Focus specialists on the questions that can change the deal.

Before design

Give engineers and consultants a sourced starting point.

08 / Questions

Before you ask.

How long does a study take?

A quick desk triage can take about a day. The timeline for a full study is confirmed after we review the parcel, intended use and scope.

What do you need from me?

The parcel ID or address and your intended use. We pull the rest from public and third-party sources.

Does this replace my civil engineer or attorney?

No — it tells you whether and when to spend on them, and hands them a clean, sourced starting point.

What if the answer is “don’t buy”?

That’s the point. A well-argued no, early, is the cheapest deliverable we produce.

Is this Florida-only?

The method is tuned to Florida, U.S.; we can scope elsewhere in the U.S. on request.

Do you do the engineering too?

The study includes screening-level site, drainage and traffic reads from public records — enough to price the deal and decide. Sealed engineering is a separate, PE-signed engagement scoped once you decide to move.

Request a study

Tell us about the parcel and what you want to build.

We will review the request and respond with scope, timing and pricing. No purchase is required to submit.

Your information is used only to respond to this request.