Florida land feasibility · pre-purchase due diligence

Know what can stop the project before you buy the land.

A structured, source-backed feasibility review that turns public records, site constraints and agency requirements into a clear next decision.

Florida-focused · Independent screening · Human-reviewed verdict

21elimination gates
99documented failure modes
1clear decision path

01 / The base rate nobody underwrites

Most pro formas assume the project lands on time. The odds say it won't.

76%

projects that finish late

State of Construction Scheduling 2025 (n > 70,000 CPM schedules)
8.5%

projects that hit budget and schedule

Flyvbjerg, Oxford (n > 16,000)
0.5%

hit budget, schedule and benefits

Flyvbjerg, Oxford
+28%

average cost overrun (85% of projects overrun)

20 countries, 70 years
0.75–1.0 pt

IRR erosion per month of delay

Innowave Studio
+4.64%

cost overrun per year of delay

Flyvbjerg

The information existed. The decision to look for it wasn't made — because it costs money in the phase where the budget is tightest and the pressure to close is highest.

02 / Technical screening inside the study

A first technical read on the parcel — from public records, inside the study.

Every feasibility study includes a screening-level pass on the things that usually cost money to discover late. Each one is an estimate built from public records with its source cited — a clear view to decide on, not sealed engineering. Where a number needs a licensed engineer to certify it, we say so, on the same line as the number.

Conceptual site sketch

A massing/yield concept from public records: roughly what fits — units, parking, where the pond lands — so you can see the program before you wire a deposit. A concept, not an engineered site plan.

Zoning & PUD pre-analysis

Future land use vs. current zoning, what the code allows, and whether it needs a rezoning or a PUD — with the open-space and dimensional traps that kill yield. Read from public records.

Topography, soil & grading (raise)

Public LiDAR and soil surveys turned into rough cut/fill, finished-floor vs. the 100-year flood, and whether the site has to be raised with fill to get out of the floodplain. Order-of-magnitude, not a sealed grading plan.

Retention pond pre-sizing

Required treatment volume from water-management-district criteria, impervious area measured by geometric union, and whether a pond of plausible size fits. Screening can rule a site out cheaply; sealed design confirms it.

Traffic / corridor capacity screening

Trip generation for your program against the road's official service volume: level-of-service today, future, and with your project. It flags whether a full traffic study and its cost belong in your price. It is not a sealed Traffic Impact Study.

Screening with cited sources · a professional opinion, not a certification · every figure has a source and a status

03 / The screening system

Every parcel runs through the same disciplined questions.

01

Land & title

Parcel identity, ownership signals, easements and recorded constraints.

02

Zoning & use

Future land use, zoning district, density, setbacks and intended-use fit.

03

Water & environment

Flood exposure, wetlands, soils, drainage and environmental flags.

04

Access & utilities

Legal access, roadway context, water, sewer, power and service gaps.

05

Cost & schedule

Known fees, likely studies, agency steps and the next professional decisions.

06

Verdict & next move

A sourced go, conditional go, or stop—with open questions clearly labeled.

04 / What you receive

A decision document, not a pile of links.

The report identifies what is known, what is estimated and what still needs confirmation—so you can price uncertainty and decide whether to proceed.

  • Executive verdictGo, conditional go, or stop—with the reason.
  • Constraint registerRisks ranked by impact and urgency.
  • Source trailAgency and public-record support behind findings.
  • Next-action planWho to call, what to verify and what to budget.

05 / Built for an early decision

Before contract

Screen fatal constraints before committing capital.

During due diligence

Focus specialists on the questions that can change the deal.

Before design

Give engineers and consultants a sourced starting point.

06 / Questions

Before you ask.

How long does a study take?

A quick desk triage can take about a day. The timeline for a full study is confirmed after we review the parcel, intended use and scope.

What do you need from me?

The parcel ID or address and your intended use. We pull the rest from public and third-party sources.

Does this replace my civil engineer or attorney?

No — it tells you whether and when to spend on them, and hands them a clean, sourced starting point.

What if the answer is “don't buy”?

That's the point. A well-argued no, early, is the cheapest deliverable we produce.

Is this Florida-only?

The method is tuned to Florida, U.S.; we can scope elsewhere in the U.S. on request.

Do you do the engineering too?

The study includes screening-level site, drainage and traffic reads from public records — enough to price the deal and decide. Sealed engineering is a separate, PE-signed engagement scoped once you decide to move.

Request a study

Tell us about the parcel and what you want to build.

We will review the request and respond with scope, timing and pricing. No purchase is required to submit.